SOLUTIONS / OCTG AUTOMATION

FROM SINGLE MACHINE
TO COMPLETE LINE.

We combine machine design, pipe handling and manufacturing workflow planning for OCTG processing projects.

PROCESS COVERAGE

INTEGRATION ACROSS
THE PRODUCTION FLOW.

01

Raw Pipe Loading

Raw pipes are received and loaded onto the production line for subsequent processing.

02

QR Code Application

A QR code is assigned to the pipe for identification and process traceability.

03

A-End Threading

The thread is machined on the A-end of the pipe according to the specified connection requirements.

04

A-End Black Scale Removal

Black scale is removed from the A-end thread area as part of the thread finishing process.

05

A-End Thread Inspection

The A-end thread is inspected to check its condition and conformity with the specified requirements.

06

A-End Sandblasting

The A-end is sandblasted as specified in the pipe processing sequence.

07

B-End Threading

The thread is machined on the B-end of the pipe according to the specified connection requirements.

08

B-End Black Scale Removal

Black scale is removed from the B-end thread area as part of the thread finishing process.

09

B-End Thread Inspection

The B-end thread is inspected to check its condition and conformity with the specified requirements.

10

B-End Sandblasting

The B-end is sandblasted as specified in the pipe processing sequence.

11

Pipe Bore Cleaning

The pipe bore is cleaned as a preparation step before the subsequent connection and finishing operations.

12

Coupling Pre-Make-up

The coupling is positioned and pre-made-up on the pipe connection before final make-up.

13

Coupling Make-up

The coupling is made up to the pipe connection as required by the specified process.

14

Thread Protector Make-up

Thread protectors are installed on the pipe ends to protect the finished threads.

15

Length Measurement, Weighing & Marking

The finished pipe is measured, weighed and marked for identification and production records.

16

Pipe Body Painting

The pipe body is painted as part of the specified finishing process.

17

Finished Pipe Stacking

Finished pipes are transferred to the stacking area for organized storage and subsequent handling.

PROJECT ENGINEERING

Line layouts tailored to your plant.

英文 讨论新车间建设、现有车间扩建或现有螺纹设备的更换。

Discuss your project ↗